Have a question?

Call us: 03333 22 11 00

Need to know more?

Email: sales@dsm-gb.co.uk

Workplace Recovery

DSM’s facility resides on a 3 acre rural site, enclosed within a steel perimeter fence with IP Camera survailence. Access is strictly controlled – entry can only be gained by authorised personnel. Three A roads provide easy access – A1M, A47, A605

The facility is not reliant on any external utility service other than connectivity.

Power is provided, primarily, by mains and backed up by dual Generator and UPS systems. All desk positions and critical equipment are powered via UPS, thus ensuring no power interruption whatsoever. Fuel supplies for the generators is stored on site and allows for 6 weeks of continuous operation at full load.

Gas: 6000 litres of LPG is stored on site for heating. This gives approx 6 weeks of continuous operation and is mainly used in winter months.

Water: DSM extracts water from a bore hole as it’s primary supply. Mains water serves as a backup only. Water is also taken from the roof and stored in external container for emergency use.

Connectivity: DSM has 3 land based fibre services from two providers. Primary circuit is an active – active service with auto failover. Secondary is an active manual backup. Services are also delivered over microwave.

DSM’s site incorporates an outside seating area and two lakes; the rural setting is peaceful and far away from the pollutants of city life but close enough not to be isolated; Shops, Hotels, Restaurants are a mere 15minute drive away. In summer months a 5 minute walk will take you to a local cafe and DSM often lights up a BBQ when weather permits.

Contact us

Our team are here to help, if you need advice or would like to discuss your requirements please use one of the methods below:

View our latest news

03333 22 11 00

sales@dsm-gb.co.uk

Please prove you are human by selecting the Plane.